For newly purchased small loaders, they cannot be put into use immediately. For your own safety, check and run in first. Let's take a look with Xiaobian:
1、 When a new car is used for one time, it should be unloaded for 2-4 hours at first.
Second, after six shifts, the engine should be replaced with new oil.
Frequently check the heating of the transmission, drive axle, wheel housing and brake.
Fourth, inspection and investigation should be strengthened during running-in, and the tightness of each fastener should be checked.
Fifth, change the oil of the transmission, drive axle and steering gear when it is hot after running in for 22 working shifts.
The new machine will be maintained and run-in before it is officially put into use, which will make people more confident and also improve the efficiency of small loaders.