The weather is getting hotter and hotter, because the temperature of the natural environment will make it difficult to install and apply the cutting machine. But should we do a good job in these safety applications and safety protection technologies under high temperature? This not only improves the safe operation procedure, but also improves the service life of the installation and cutting machine.
?? 1. After entering the high temperature, the performance of various components of the air intake system shall be checked purposefully. A 6-ton loader shall be hired to make the oil pressure gauge and the transmission air pressure gauge accurately marked. To the transmission Conduct system software inspection on the oil in the torque converter and driver, from the quality of oil to the total amount of oil, and keep the oil clean.
? ? 2. Regularly check the overall braking efficiency, so as to find and clear common faults of the braking system software in time, reduce safety accidents and stabilize the patient. When the brake is used for a long time, the temperature of the brake hub and brake pad is too high, and the brake performance is reduced. Stop the machine immediately to reduce the temperature, so as to prevent the hidden danger of overall work safety. However, it is not allowed to flush the brake with cold water to force cooling.
? 3. Check the belt of the centrifugal pump fan drive system. After long-term use, the belt will be tired Deformation reduces the actual effect of refrigeration. When replacing the belt, pay attention to the model, specification and length, and properly adjust the tightness. Hire a three ton loader to check the connection between the water storage tank and the rubber hose. The rubber hose of the water storage tank has poor abrasion resistance and is easy to be damaged at the initial stage, endangering the water flow and causing the temperature of the automobile engine to rise. Check for cracks and water seepage and remove them as soon as possible. At the same time, a certain amount of cooling circulating water shall be ensured. If it is found to be insufficient, it shall be added in time.